Redise?o de la planta construcciones met?licas ?el arco? para la optimizaci?n de sus procesos, per?odo 2014, ubicada en la Panamericana Norte km 2 ?

The research is on production optimization at "El Arco" Metal Constructions Company. The goal is to reduce the time, improve the equipment distribution, machines, tools and work areas. For this, the current situation was analyzed then it gave the tools to start this investigation by studyi...

Full description

Saved in:
Bibliographic Details
Main Author: Aimaca?a Alomoto, Alex Geovanny
Other Authors: Tello C?ndor, Marcelo
Format: Tesis de Pregrado
Published: LATACUNGA / UTC / 2015 2016
Subjects:
Online Access:http://repositorio.utc.edu.ec/handle/27000/2910
Tags: Add Tag
No Tags, Be the first to tag this record!
id oai:oai:repositorio.utc.edu.ec:27000:27000-2910
recordtype dspace
spelling oai:oai:repositorio.utc.edu.ec:27000:27000-29102016-10-11T08:00:47Z Redise?o de la planta construcciones met?licas ?el arco? para la optimizaci?n de sus procesos, per?odo 2014, ubicada en la Panamericana Norte km 2 ? Aimaca?a Alomoto, Alex Geovanny Tello C?ndor, Marcelo CONSTRUCCIONES MET?LICAS OPTIMIZACI?N DE SUS PROCESOS REDISE?O PRODUCCI?N The research is on production optimization at "El Arco" Metal Constructions Company. The goal is to reduce the time, improve the equipment distribution, machines, tools and work areas. For this, the current situation was analyzed then it gave the tools to start this investigation by studying the different processes diagrams, flows and routes. The plant?s production line presents problems. They gradually indicate low productivity rates relative to the design rates, inadequate working conditions for operators? right performance, production delays by excess path having the raw materials and other causes that were checked, analyzed and evaluated during the study. This achieve in real-time production of various products that the plant offers to its clients. The current situation analysis provoked the present proposal that is based on the production process optimization. En el presente estudio se realiz? una Optimizaci?n de la producci?n, en la Planta ?Construcciones Met?licas El Arco?, con la finalidad de reducir los tiempos muertos, mejorar la distribuci?n de los equipos, maquinas, herramientas y ?reas de trabajo, para lo cual se analiz? la situaci?n actual y luego se obtuvo la nueva propuesta de la planta mediante el estudio de los diferentes diagramas de procesos, flujos y recorridos. La l?nea de producci?n de la planta presenta problemas, mismos que paulatinamente indican ?ndices bajos de productividad con respecto a los ?ndices de dise?o, condiciones de trabajo no adecuadas para el buen desenvolvimiento de los operadores, demoras de producci?n por el exceso de recorrido que tiene la materia prima y otras causas que fueron revisadas, analizadas y evaluadas durante el estudio. Llegandose a obtener tiempos reales de producci?n de los distintos productos que la Planta ofrece a sus clientes, por medio del an?lisis de la situaci?n actual, procedimos a la propuesta del estudio en base a la optimizaci?n del proceso de producci?n. 2016-10-10T17:17:00Z 2016-10-10T17:17:00Z 2015 bachelorThesis Aimaca?a Alomoto, Alex Geovanny (2015). Redise?o de la planta construcciones met?licas ?el arco? para la optimizaci?n de sus procesos, per?odo 2014, ubicada en la Panamericana Norte km 2 ?. Ingenier?a Industrial. UTC. Latacunga. 200 p. http://repositorio.utc.edu.ec/handle/27000/2910 spa openAccess http://creativecommons.org/licenses/by-nc-sa/3.0/ec/ 200 p. LATACUNGA / UTC / 2015
institution UTC
collection Repositorio UTC
universidades UTC
language
format Tesis de Pregrado
topic CONSTRUCCIONES MET?LICAS
OPTIMIZACI?N DE SUS PROCESOS
REDISE?O
PRODUCCI?N
spellingShingle CONSTRUCCIONES MET?LICAS
OPTIMIZACI?N DE SUS PROCESOS
REDISE?O
PRODUCCI?N
Aimaca?a Alomoto, Alex Geovanny
Redise?o de la planta construcciones met?licas ?el arco? para la optimizaci?n de sus procesos, per?odo 2014, ubicada en la Panamericana Norte km 2 ?
description The research is on production optimization at "El Arco" Metal Constructions Company. The goal is to reduce the time, improve the equipment distribution, machines, tools and work areas. For this, the current situation was analyzed then it gave the tools to start this investigation by studying the different processes diagrams, flows and routes. The plant?s production line presents problems. They gradually indicate low productivity rates relative to the design rates, inadequate working conditions for operators? right performance, production delays by excess path having the raw materials and other causes that were checked, analyzed and evaluated during the study. This achieve in real-time production of various products that the plant offers to its clients. The current situation analysis provoked the present proposal that is based on the production process optimization.
author2 Tello C?ndor, Marcelo
author_facet Tello C?ndor, Marcelo
Aimaca?a Alomoto, Alex Geovanny
author Aimaca?a Alomoto, Alex Geovanny
author_sort Aimaca?a Alomoto, Alex Geovanny
title Redise?o de la planta construcciones met?licas ?el arco? para la optimizaci?n de sus procesos, per?odo 2014, ubicada en la Panamericana Norte km 2 ?
title_short Redise?o de la planta construcciones met?licas ?el arco? para la optimizaci?n de sus procesos, per?odo 2014, ubicada en la Panamericana Norte km 2 ?
title_full Redise?o de la planta construcciones met?licas ?el arco? para la optimizaci?n de sus procesos, per?odo 2014, ubicada en la Panamericana Norte km 2 ?
title_fullStr Redise?o de la planta construcciones met?licas ?el arco? para la optimizaci?n de sus procesos, per?odo 2014, ubicada en la Panamericana Norte km 2 ?
title_full_unstemmed Redise?o de la planta construcciones met?licas ?el arco? para la optimizaci?n de sus procesos, per?odo 2014, ubicada en la Panamericana Norte km 2 ?
title_sort redise?o de la planta construcciones met?licas ?el arco? para la optimizaci?n de sus procesos, per?odo 2014, ubicada en la panamericana norte km 2 ?
publisher LATACUNGA / UTC / 2015
publishDate 2016
url http://repositorio.utc.edu.ec/handle/27000/2910
_version_ 1635478128895721472
score 11,871979